2015-2016, MEDAŞ EDCo
For licensed (installed power above 1 MW) and un-licensed PV power plants, main targets of the project are development of criteria for grid connection, power system simulations required and protection coordination studies; in case of abnormal working conditions and risk analysis to decrease health and safety problems in new grid environment.
Our Services
- Literature review, regulation and sector application investigation
- Data provision and site measurement studies
- Connection Criteria development for PV grid connection
- Protection requirement development
- Monitor and control system identification
- Adaptive protection method development
- Risk analysis for health and safety